SHER INGENIEURS-CONSEILS S.A.
A BETTER STRATEGY FOR THE ENVIRONMENT
Since 1997, we develop our experience regarding services of environmental requirements in Belgium by realizing:
- Soil studies (orientation and characterization),
- Environmental assessment studies,
- Environmental permits,
- Studies of perimeters for the protection of water sources,
- Hydrogeological studies (tracer tests, modelling, flows, dispersions, diffusions, etc...)
Moreover, we advise you and we help you to develop and manage your environmental policy according to legal legislation.
At last, we propose you qualifying seminars intended to persons in charge of companies, for independent or private individuals to manage the problems related to their activity.
These trainings are given in our center located in the capitol of Walloon region at Jambes (Namur).
OUR CERTIFICATES
We are registered by the Walloon region as:
- Expert in the discipline "Soil and subsurface
pollution" for patrol stations (08.03.2005, renewed the 18.01.2008
for 3 years),
- Elaborator of incidence studies for the categories: n°3
mines and quarries, n°6 waste management and n°7 water management (collection,
purification, distribution and treatment) (10.03.2003, renewed the 27.10.2008
for 3 years),
- Expertise in "Energetics Audit" (from 07.07.2008
until 07.07.2011),
- Consultant in environmental management (01.04.2005),
We are registered by the region of Bruxelles
Capitale as :
- Expert in the discipline "Soil pollution"
for a 15 years period (08.03.2005).
OUR REFERENCES
- Indicative study for an unused Factory Site of an old foundry for the municipality of Herstal
- Protection zone study of 11 water catchments of the municipality of Libin for AIVE
- Constitution of 11 files "Exploitation permits" for 11 water catchments of the Municipality of Libin
- Framing for tracings tests on a polluted site for SITEREM
- Percolation and dispersive drains tests of an autonomous treatment plant for an allotment in Bonnine
- Constitution of a single file "Single permit and Environmental permit" category 2 on behalf of the cement factory CBR in Lixhe
- Orientation Study of an ancient waste disposal site "Palimont" in Oreye on behalf of the SPAQuE
- Elaboration of legal documents for the "Environmental permits"- category 2 on behalf of the cement factory CBR in Lixhe
- Constitution of a single permit category 2 on behalf of the concrete factory of Ghislenghien CCB
- Two Orientation Studies for patrol stations
- Technical Assistance for the land conciliation study of Rebecq-Tubize - Management of the section "Soil deposit" as well as provision of the project leader
- Protection zone study of the water catchments Hubermont, Corbais and Céroux Mousty on behalf of the IECBW
- Protection zone study of 8 water catchments in the area of Blicquy for the TMVW
- Protection zone study of 3 water catchments in the municipality of Tintigny on behalf of the AIVE
- Protection zone study of 8 water catchments in the municipality of Walcourt for the INASEP
- Incident study relating to the single permit category 1 of a wastewater purification plant for 90.000 inhabitants in Braine-Le-Château on behalf of the IBW
- Sanitation study of the future sludge calcinations plant, hydrological assessment and environmental follow-up of the CETEM
YOU ARE CONCERNED
1. If you perform one of the activities mentioned in the list of projects subject to impact studies or quoted in the list of installations and classified activities (AGW - Decree of the Walloon Government - dating 04/07/2002), you are subject to undertake an impact study and/or to accomplish an environmental permit under the following conditions:
- You are a new company,
- You are an existing company and your concession expires,
- You are an existing company and you wish to extend or transform your activities,
- You are an existing company and you wish to move your establishment.
2. If you deploy a patrol station, you instructed to undertake an indicative soil and subsoil study when implementing the regulations prescribed in paragraph 681 bis/74, § 4:
- at the cessation of business activity,
- at the final shut-down of a tank,
- at the revocation or renewal of a commission,
- at the change of the owner, or finally
- if there are precise and concordant presumptions of pollution risks, at the justified request of the technical public servant (AGW dating 04/03/1999),
3. If you are the client of a parcelling project or architect, you will possibly commission hydrological or hydrogeologic studies such as permeability tests for individual treatment plants,
4. If you are a local authority you will perhaps undertake security perimeter studies of water catchments.
CONTACT :
MED TALBAOUI
Hydrogeologist - Geotechnician
Environmental Department Manager
15, Rue Jean Matagne
5020 Vedrin (Namur)
Tél. : +32(0)81.32.79.80
E-mail : talbaoui@sher.be